Dedicated Plant Manager offering 19 years of experience in manufacturing and operations. Decisive leader and complex problem solver with group leadership skills and creative troubleshooting through varying challenges. Impeccable bookkeeper with complete awareness of inventory, productivity and targets.
Overview
21
21
years of professional experience
Work History
Plant Manager
M/S GOUROCK PLASTIC & PACKAGING LTD
01.2013 - Current
Plant In-charge (PET Injection Blow molding Unit,Cap Compression unit )
Manufacturing of PET Preform & Bottles (200 ml to 2 liter ),CCM closures
Manufacturer and supplier of all type of blown films and printed carrier bags
Responsible for management of activities includes Production & Maintenance (preventive and Break down both ) of all the machines .
Training of subordinates, Development of system (Developing systematic approach for Quality Production, preventive maintenance etc ) and process improvement .Procurement of spares /Machine
Man power management & Techno-commercial activities of PET molding Unit.
Managed direction and planning for plant with focus on optimization of daily functions.
Optimized processes to maximize efficiency.
Directed employees and related programs to maximize team productivity and facility output.
Provided direction and leadership to all levels of employees and managers.
Maximized plant safety through proactive strategies and well-structured training.
Maintained quality of product with robust inspections and assessment team.
Monitored and supported progress of plant production orders by managing shop capacity and loading functions at several facilities.
Created new training program with focus on staff safety, food safety and production quality to achieve reduced labour costs and tighter control points.
Evaluated production schedules and orders to arrange required materials and plan staffing needs.
Oversaw routine maintenance programs and scheduled service to keep equipment functioning at peak levels.
Diagnosed and corrected issues with systems, components and controllers.
Managed personnel by implementing company policies, procedures, work rules and disciplinary action.
Prepared and maintained production reports and personnel records.
Collected samples for laboratory analysis.
Worked with senior leadership to complete under-budget management on complex issues.
Project Manager
M/S Jaynim Industries Ltd
11.2012 - 01.2013
Plant set up & operation)
Ball pen manufacturing unit
Successfully completed new project for manufacturing ball pen .
Senior Engineer
M/S PAPERMAT PEN INDUSTRIES PVT LTD
07.2011 - 10.2012
Plant operation
Manufacturing of Ball pen For STAEDTLER, GERMANY
Export Oriented Company
Fully integrated plant from pen processing to refill filling and assembling of ball pen
Responsible for developing and implementing production/processing methods and controls to meet quality standards in most cost efficient manner
Perform investigation and resolve work-in-process problem
Handle tasks of recommending and implementing improvements and modifications in sequence of operations, equipment utilization and related matters
Monitor assigned operations to assure compliance with approved methods and quality standards
Responsible for supervising and managing plant, equipment and process improvement projects
Coordinate with Plant Process Engineers and hourly technical personnel to optimize manufacturing processes
Procurement of materials related to machineries, moulds, Ancillary equipment's etc.
Sr Plant Engineer
M/S ACME CONTAINERS LTD
11.2006 - 05.2011
Preventive maintenance of equipment based on criticality of service and complexity of equipment
Maintained safe working environment by enforcing rules and regulations.
Identified spare parts needed and requisitioned parts to keep equipment in top operating condition.
Determined root cause of equipment failures and implemented solutions to eliminate repetitive downtime.
Training of human resources .
Production Engineer
M/S Prince pipes & fittings pvt ltd
04.2006 - 11.2006
Working as Shift in charge
Responsible for new mould start up and rejection control
ISO documentation
Trouble shooting of defect items
Manpower control.
Production Engineer
M/s POLYSET PLASTICS LTD
01.2004 - 04.2006
Injection Molding)
Looking After process monitoring & Process parameter setting of molds
Trouble shooting molding defects
Trial of New moulds
Liaison with Quality to control rejection
Waste management
Manpower control.
Junior Engineer
M/s MOSER BAER (I) LTD
10.2002 - 01.2004
Injection Moldings & CDR Line
Worked As Module in charge
Responsible for changing of New Stampers, trouble shooting of molding defects & reporting to shift in charge.
Education
CIPET - POST GRADUATE DIPLOME IN PLASTIC ENGINEERING
CIPET
BHUBANESWER,INDIA
08.2002
Bachelor of Science - PHYSICS,CHEMISTRY,MATH
UTKAL UNIVERSITY
SALIPUR COLLEGE,SALIPUR,ODISHA
07.1999
Skills
Processing Operations Review
Expertise in PET turnkey projects solutions (procurement,installation,commissioning)
Production Oversight
SAP Business One exposure
New Product Development
Negotiation skill and Procurement ,Logistics
Product Planning
Profound knowledge of Hydraulics & Electrical used in Plastic Processing field