Summary
Overview
Work History
Education
Skills
References
Interests
Languages
Timeline
Generic
Conrad Kafunda

Conrad Kafunda

Electrical Engineer
Lusaka,Lusaka

Summary

I am a professional engineer with more than Sixteen years of experience in world class health and safety management systems, plant maintenance and operations management, Project management (Major shutdown maintenance and plant improvement), warehouse management, engineering spares procurement and management, electrical and mechanical maintenance and design and implementation maintenance management systems and strategies. I have experience in the design and installation of solar power systems (renewable energy) in plant systems and rural water supply and lighting systems. I am also experienced in implementation of change management to help in improving the health and safety and maintenance cultures in the plant. I have excellent experience with CMMS & ERPs like JD Edwards, Maximo 7.1, FiXX, SAP ERP 6.0, and Flowcentric. AutoCAD, MSD365…… My over 16 years of experience has been in supporting operations in maximizing the utilization, reliability and cost effectiveness of the process plant fixed assets that will include but not limited to crushers, conveyors (screw, belt, air slides & elevator), grinding mills, HV electrical drives, MV & HV distribution systems, Electric Motors & Starters and Transformers whilst ensuring compliance with relevant procedures, policies, legal requirements and consent conditions. Skills and Attributes: Proven Leadership skills and management capability Excellent interpersonal and communication skills - clear capability and credibility to influence at all levels. Highly developed analytical skills with excellent problem-solving capability Attention to detail and commitment to quality is non-negotiable. Ability to train and coach own team (s). Ability to apply problem solving skills at all levels and implement associated systems Is a logical thinker with the ability to determine quick solutions when problems arise Ability to reflect and analyse with precision Ability to be pragmatic, and able to place equal emphasis on quality and productivity Ability to be systematic and analytical helps to foster high quality outputs Assertiveness Negotiation skills Preventive Maintenance(Reliability) Manager at Lafarge Cement Zambia, Ndola February 2008 — March 2018 (Maintenance operations) Determined and planned necessary preventive and corrective actions to assure long term reliable functioning of equipment and installations. Managed new projects from engineering design stage to implementation, and training, estimated total cost of $25 million. Managed preventive maintenance and played key role in reducing downtime by

Overview

19
19
years of professional experience

Work History

Maintenance/Utilities Manager

Coca Cola Beverages Zambia
Lusaka
03.2018 - Current
  • Managed health and safety of all subordinates by ensuring all safety standards and policies are adhered to by subordinates and other employees and contractors
  • Conducted risk assessment for all high risk jobs and approved all risk assessments done before commencement of work by employees or contractors
  • Conducted all plant safety training or lectures to improve employee understanding on the safety standards and the safety statistics
  • Participated and lead incident investigations and formulation of action plans to prevent recurrence of incidents
  • Developed actions for closure of site unsafe conditions, near misses
  • Implemented the maintenance management system (inclusive of reliability engineering) as per AB-Inbev standards
  • My key outputs & accountabilities being
  • To draw up and communicate a business plan annually so that direction and objectives of the department are optimally planned, executed and monitored in line with CCBA iD’S strategic objectives
  • To set performance goals together with the team so that team members know, understand and can work effectively as a team towards common goals and purpose
  • To drive SCW initiatives in the Business environment
  • To manage and support team leaders and team to achieve production, maintenance and quality targets in a cost effective manner
  • To formulate and control expense and capital budgets so that expenses are planned for and managed effectively within budgetary parameters
  • To encourage, assist, support and coach Team Leaders so that departmental targets, performance and future challenges are achieved effectively
  • To manage and facilitate conflict resolution within the unit to optimise unit relationships and performance
  • To sell, manage, implement and actively support change interventions and projects to encourage the unit to internalise the change to meet operational targets
  • To actively develop oneself to achieve career goals and to optimise individual and unit performance/ productivity
  • Ensure compliance to Safety and Statuary requirements
  • Manage Asset Care within the Utility department standards
  • Defined all routine maintenance required by all plant equipment and developed standard procedures and work instructions to perform all routine work to standardize the quality
  • Developed a schedule for planned maintenance outages as part of preventive and predictive maintenance program
  • Implemented improved training programs for maintenance employees
  • Supervised daily operations, including employee performance, preventive maintenance and safety
  • Managed Project cost saving of about 5% of planned cost
  • Monitored and reviewed financial performance of department
  • Managed the Engineering spares and warehouse
  • Defined engineering stock level following an equipment criticality analysis, defined routines and FMEA

Electrical/Instrumentation Manager

Lafarge Cement Zambia
10.2004 - 02.2008
  • And increased plant efficiency by 12%
  • Developed plans to effectively utilize technical resources to achieve goals by engaging team members to participate in plant operation and line breakdowns
  • Maintained budgets of $1.450 million dollars annually by focusing on reducing equipment breakdowns and utilizing KPI
  • Effectively managed spare parts inventory by utilizing CMMS program resulted in $135,000 savings
  • Monitored equipment conditions and organized periodic calibration to ensure proper operation and reduce re-work by 26%, generating savings of $130,000 annually
  • Was in charge of planned annual shutdown programs
  • Established preventive maintenance plans in cooperation with Production
  • Manager, Electrical and Mechanical Maintenance Supervisors and Projects
  • Department
  • Monitor implementation and execution of preventive maintenance tasks and procedures
  • Record equipment and installation history
  • Control lubrication and condition monitoring tasks of equipment and installations to identify needs of maintenance actions and reduce risks of unplanned downtime
  • (Management – Planning & Cost control) In charge of the development and control of maintenance budget, ensuring planning and follow-up of costs
  • I led planning for all foreseeable operations (weekly, monthly, annual and major shutdowns)
  • (Standards) Communicated and implemented regulations, company goals, local permits, policies and procedures; optimize internal processes and structures
  • Supervised personnel to apply them consistently and ensure ISO compliance
  • Respect Maintenance Cement (MAC) & Maintenance Management System (MMS) standards; follow up weekly MAC targets (Key Performance
  • Indicators
  • (People management) Developed and motivated my teams, ensuring competencies and skills development according to technical innovations, plant or personal needs
  • Train and coach maintenance team on preventive and predictive maintenance routines and requirements
  • (HSE Management) Guaranteed compliance with H&S, environment policies, maintenance legal policies by ensuring their inclusion during the definition of maintenance plans and routines
  • Conducted planned task observations on employees to observe the level of adherence to the required safety standards
  • Conducted Visible Felt Leadership audits on site to emphasis the importance of consistently adhering to the safety requirements
  • Pre-defined all generic safety requirements (risk assessment and mitigations actions) for plant tasks during planning stage of the tasks
  • (Warehouse Management) Contributed to Net Working Capital optimization by identifying critical parts (based on equipment criticality analysis, FMEA, risk assessment and implementation of preventive maintenance routines on critical equipment) and establishing optimal stock levels of spare parts
  • (Innovation and continuous improvement) Considered new techniques and/or technologies to optimize maintenance cost and improve technical condition and functioning of installed equipment
  • Supply Chain & Warehouse Management) responsible for overseeing and managing engineering overall supply chain and logistics strategy and operations in order to maximize the process efficiency and productivity
  • In addition, played a crucial role in developing and maintaining good relationships with vendors, contractors and distributors
  • Worked well independently and on a team to solve problems
  • Organized and prioritized work to complete assignments in a timely, efficient manner
  • Effectively managed projects from start to finish
  • Worked well in a fast-paced and rapidly changing environment
  • Used effective listening skills to document phone call details
  • Executed quality maintenance work on all electrical equipment
  • Effectively managed and supervised electrical staff
  • Designed and implemented all plant electrical projects
  • Guided and managed daily functions of electrical section to achieve best possible plant reliability through proper installation and maintenance of electrical instrumentation and associated equipment
  • Ensured that all equipment installed and electrical work is in accordance with world class electrical standard specifications and appropriate Lafarge electrical standards and safety requirements
  • Became familiar and developed understanding in process requirements and assisted in achieving production targets
  • Interacted with external organizations such as the government and ZESCO and organized monthly meetings to review the needs and required actions
  • Ensured efficient/cost effective and reliable operation of all plant electrical equipment
  • This includes working together with other departments to solve problems
  • Was responsible for ongoing effective planned electrical plant maintenance as well as planning for plant shutdowns
  • Was the LOTOTO champions and was competent to follow and train employees on permit to work system and ensure that subordinates and all employees comply
  • Was responsible for budgeting and cost control within electrical section
  • Was responsible for medium term planning (1-2 years) to ensure reliability of all electrical plant equipment and implementing continuous improvement projects within electrical department
  • Was very conversant with and competent to plan, design and manage renewable electrical upgrade and plant extension projects at Ndola works
  • Conveyed management policies to subordinates
  • Communicated results to management
  • Developed and implemented training plans
  • I was actively involved during plant breakdowns to ensure minimum plant downtime
  • Worked well independently and on a team to solve problems
  • Served as a friendly, hardworking, and punctual employee
  • Organized and prioritized work to complete assignments in a timely, efficient manner.

Education

Master of Business Administration -

University of New South Wales
12.2021

SEW Euro Maintenance & Service of Gearboxes, Motors & Brake systems, SEW Euro Drive PTY -

12.2019

ISO: 9001:2015 Certified Internal Auditor -

12.2019

09.2019

Steam Boiler & Stoker Maintenance, John Thomson PTY -

08.2019

White Belt Problem Solving Certification -

09.2017

Trained under Lafarge Cement professional qualification program and certified as a qualified Cement professional. COURSES Siemens Drive Maintenance & Commissioning, John Thomson PTY -

12.2009

Bachelor of Electrical - Mechanical Engineering, Energy Systems

Copperbelt University, St John Convent School
01.2003

Master of Business Administration (MBA) -

12.1996

D.O.B -

10.1978

MAINTENANCE LEAD -

01.1967

Skills

  • Conflict Resolution
  • Interpersonal Skills
  • Ability to Multitask
  • Critical thinking and problem
  • Solving
  • Problem Solving
  • Decision Making
  • Microsoft PowerPoint
  • Microsoft Office
  • Computer Skills
  • Effective Time Management
  • Communication
  • Adaptability
  • Communication Skills

References

REFERENCES Phillip Musonda from Konkola Copper Mines PLC musondaphillip@gmail.com +260966220904 Nason Kasoma from LafargeHolcim Zambia nason.kasoma@lafargeholcim.com +260962926499 Bonaventure Lubinga from Zambian Breweries PLC bonaventure.lubinga@zm.ab-inbev.com +260974776927

Interests

Ability to Work in a Team , Ability to Work under Pressure Leadership Skills Equipment Maintenance HOBBIES Playing and Watching Soccer, Social and Community Services, Travelling, Reading Books

Languages

  • English
  • Timeline

    Maintenance/Utilities Manager

    Coca Cola Beverages Zambia
    03.2018 - Current

    Electrical/Instrumentation Manager

    Lafarge Cement Zambia
    10.2004 - 02.2008

    Master of Business Administration -

    University of New South Wales

    SEW Euro Maintenance & Service of Gearboxes, Motors & Brake systems, SEW Euro Drive PTY -

    ISO: 9001:2015 Certified Internal Auditor -

    Steam Boiler & Stoker Maintenance, John Thomson PTY -

    White Belt Problem Solving Certification -

    Trained under Lafarge Cement professional qualification program and certified as a qualified Cement professional. COURSES Siemens Drive Maintenance & Commissioning, John Thomson PTY -

    Bachelor of Electrical - Mechanical Engineering, Energy Systems

    Copperbelt University, St John Convent School

    Master of Business Administration (MBA) -

    D.O.B -

    MAINTENANCE LEAD -

    Conrad KafundaElectrical Engineer