To contribute to the expansion and success of my employer through: Exceptional versatility and adaptability to changing work environments. Dedication as a hard-working individual with ability to analyse problems and formulate solutions Superlative communication and team-building skills Ability to manage multiple tasks in a pressured environment Self-motivation, ambition and drive to demand the best of self in any given situation In doing so, I aim to achieve the highest standard of work, contribute to the improvement of standards in the company and the industry.
Overview
24
24
years of professional experience
Work History
Senior Engineer- Dumps and Infrastructure
First Quantum Trident Mine Company
05.2022 - Current
In charge of all long term to short term mine projects
Experienced and safety-focused Mining Engineer with a proven track record in managing infrastructure projects and mine planning.
In charge Waste Rock Dump dumping sequence depending on the material type ( Acid generating and Non Acid Generating material).
Waste Rock Dump rehabilitation with drainages following environmental requirements, capping with topsoil for vegetation plantation.
Waste Rock Dump Drains design and excavation for contaminated and Non Contaminated Channels to separate clean and contaminated water.
Assist in waste Dump Audits and produce reports to be shared with operations and management.
Haul and mine road designs and supervise the execution, following that all is built to design requirement.
Electrical infrastructure building requirement assistance ( trolleys, powerlines and substations).
Pit Sump designs following the catchment and working with dewatering team.
In charge bush clearing and topsoil stripping where required.
Skilled in using advanced mining software and data analysis to
In charge bush clearing and topsoil stripping where required.
Skilled in using advanced mining software and data analysis to improve productivity while ensuring regulatory compliance and sustainable practices.
Overseeing design, construction, and maintenance of surface facilities and other infrastructure.
Developing and updating as-built maps, creating solid models, and managing resources.
Managing engineering projects, ensuring regulatory compliance, and working with tight deadlines.
Managing engineering projects, ensuring regulatory compliance, and working with tight deadlines.
Short term planning Engineer/Projects engineer
Barrick Lumwana Mining Company
10.2015 - 04.2022
Promote a culture of safety and productivity
Continuous business improvement
Quarterly Monthly Mine plans, Weekly to Daily Production of copper and uranium
Monthly Drilling Plan (multi-staged pits)
Work hand in hand with dispatch over the mine Operating System
Planning Dump Management and Strategy Monitoring of Production limiting equipment trucks (Euclid EH4500) and shovels (Hitachi EX5500) Producing the combined Ore feed plan for multi-pits to the mill
Mentoring graduate mining engineers in the graduate programme
Reconciliation plan and spatial compliance
Producing the daily production plan, Complete detailed pit weekly production plan
Produce month-by-month face advance plans for pits, waste dumps, and other earthworks infrastructure
Produce the weekly reconciliation and spatial compliance for the past week Weekly Planning of waste and ore volumes
Track mining costs against plan
Ensure day to day Ore feed requirements are being met
Undertake detailed design and business improvement as required
Prepare Short and Long term production plans in order to maintain economical and efficient underground operations
Coordinate all Short Term mine planning activities in compliance with mining standards
Generate mine plans using Deswik design software, Vulcan design software
Run production schedules using Deswik and vulcan
Control of costs
Ensure all designs generated in the area of responsibility conform to the safety, health and environmental requirements obtaining in Mining.
Drill and Blast Engineer
Barrick Lumwana Mining Company (Copper and uranium)
09.2013 - 09.2015
Optimisation of blasting process
Liaising with blast suppliers and contractors
Drill and blast pattern design
Support Drill and Blast Optimisation Engineer
Uphold culture of Smarter, Bolder, Driven
Preform any other duties as assigned by the Chief Mining Engineer
Provide mentoring and guidance to Drill and Blast Planning Engineers
Perform accurate design duties on time for all drill and blast activities at operations
To maintain and improve safe work practices
Undertake 'Drill and Blast' related project studies and investigations
Maintain and enhance contractor relationships
Provide drill and blast engineering services including blast hole pattern design and 'tie-in'/charge design
In consultation with planning personnel, prepare blast master for all mining areas 3 months in advance
Liaise with the Short Term Planning Engineer and Production Superintendent to efficiently schedule the drilling and blasting requirements and minimise interruption of other mining operations
Liaise with the Drill and Blast Superintendent to ensure drilling and blasting operations are carried out in a cost effective manner
Liaise with the Drill and blast Superintendent to develop and implement procedures that optimise the drill and blast process
Resolve drill and blast technical problems
Prepare, monitor and update production data associated with drilling and blasting activities
Review Q/A data, digging sheets and blast videos to determine areas of further improvement
Liaise with consultant and specialist suppliers as required
Inspect drill and blast areas periodically
Consult and develop a close working relationship with the Geotechnical Engineer in order to optimise pit wall stability.
Mine Projects Engineer
Barrick Lumwana Mining Company (Copper and uranium)
09.2012 - 08.2013
Manage the planning and project controls in the mine
All design works for all mine projects
Surface road designs for the mine
Drainage design
Culvert installation design
Go line design for the trucks change shift
Pit roads designs
Mine car park designs with drainages and traffic management plan
Pit ramp designs
Pit and dump designs
Dump silt traps and toe drains designs
Haul maintenance schedule
Monthly traffic management plan
Dam embankment designs with spillages
Pit and expit silt trap and sump location designs with drainage to main water dam
Wet weather management plan for the year
Follow up on all projects and report making
Reducing costs on projects and advising
Making schedule for all projects from start to finish
Design of shovel pads for maintenance works
Reporting periodically to senior management on program schedule
Undertake detailed design and business improvement as required.
Mine Operations Engineer
Barrick Lumwana Mining Company (Copper and uranium minerals)
07.2010 - 08.2012
The implementation & maintenance of procedures, processes and databases for all production engineering functions (scheduling, drill and blast, cost and reporting)
Create and review drill pattern designs, charging plans and tie-in designs to ensure safe and qualitative execution can be carried out in the field
Developing best practice systems, tools and techniques to improve drill and blast functionality and managing drill and blast data integrity, explosive inventory and consumables management
Compilation of the weekly plan and reconciliation of the previous plan figures for presenting to management
Monitoring effectiveness of operations and identifying areas for improvement Supporting the development and implementation of best practices for optimal production
-Design of drill and blast plans
Drill and blast Monthly plan and reporting
Drill and blast weekly mine plan
Weekly spatial compliance and reconciliation report preparation for drill and blast
-Monitoring of contractor drilling quality control analysis
Drilling and blasting accessory cost tracking
Management of (African explosive limited) AEL contract with Lumwana mine.
Mining Engineer
Equinox Lumwana Mining Company (Copper and uranium)
08.2009 - 06.2010
Open pit mining operations (Open pit familiarisation programme)
Worked under mine planning department, geology, survey, load and haul and drill and blast.
Blasting licence lessons in all mining operations.
Graduate Mining Engineer
Glenco Mopani Copper Mines
12.2004 - 12.2005
In fifth year of study at the University carried out a 12 months research study entitled 'Establish the causes of dilution in Mechanised Continuous Retreat mining method' at Mopani Copper Mines Underground Mine in Mufulira
The main objective of the project was to look at the ways in which dilution can be reduced
Producing the daily production plan
Complete detailed pit weekly production plan
Produce month-by-month face advance plans for pits, waste dumps, and other earthworks infrastructure
Produce the weekly reconciliation and spatial compliance for the past week
Weekly Planning of waste and ore volumes
Track mining costs against plan
Provide updated cost estimates for use in Reserve definition
Ensure day to day Ore feed requirements are being met
Track the dilution assumptions used by the open pit
Undertake detailed design and business improvement as required.
Graduate Mining Engineer
Glenco Mopani Copper Mines
03.2002 - 12.2003
Attachment with Mopani Copper Mines in Mufulira for the familiarization of Underground operations/activities: Shaft operations
Development ends drilling
Charging/timing and blasting (misfires and lashing with loaders)
Stoping operations- drilling, charging/timing
Blasting and dealing with misfires.
Education
Bachelor of Mineral Sciences in Mining Engineering -
University of Zambia
12.2005
GCE certificate -
Senior education school
12.1998
Skills
Exceptional versatility and adaptability to changing work environments
Dedication as a hard-working individual with the ability to analyze problems and formulate solutions
Superlative communication and team-building skills
Ability to manage multiple tasks in a pressured environment
Self-motivation, ambition, and drive to demand the best of self in any given situation
3D Deswik Mining Planning Software
3D Vulcan Mining Planning software
Surpac Mine Planning Software
Microsoft Project
Microsoft Word
Excel user
Languages
English
Proficient
C2
Spanish
Beginner
A1
Timeline
Senior Engineer- Dumps and Infrastructure
First Quantum Trident Mine Company
05.2022 - Current
Short term planning Engineer/Projects engineer
Barrick Lumwana Mining Company
10.2015 - 04.2022
Drill and Blast Engineer
Barrick Lumwana Mining Company (Copper and uranium)
09.2013 - 09.2015
Mine Projects Engineer
Barrick Lumwana Mining Company (Copper and uranium)
09.2012 - 08.2013
Mine Operations Engineer
Barrick Lumwana Mining Company (Copper and uranium minerals)
07.2010 - 08.2012
Mining Engineer
Equinox Lumwana Mining Company (Copper and uranium)