Fabrication & Construction of 6-off 60m x 20m and 1-off 40m x 20m Enterprise Geology Core Sheds, Enterprise Nickel Mine Site, 2024, Enterprise Nickel Concentrate Shed Extension, Enterprise Nickel Process Plant, 2024, Design Modification, Fabrication and Construction of Sentinel Mobile Warehouse, 2024, Design, Fabrication and Construction of 2-off Truck Exchanger and Fatigue Stations (Modular Design) for Sentinel Mining Operations, Sentinel Mine, 2024, Main Warehouse Shed Corrosion Protection, Commercial Department, 2024, Environmental Oil Shed Design, Fabrication, 2024, Synclinorium Shaft Headgear: Installation of Steel structure and Commissioning the Hydraulic Control System for the compensating sheaves, Murray & Roberts Cementation (Z), $3.1m, Installation and Commissioning of 500 kg capacity T1-05 Soltec Elevator, SA French, South Africa, $108,000, Installation and commissioning of CV01A Surface Conveyor at Synclinorium Shaft, Nkana, $981,000, Installation and commissioning of TD01, underground waste handling conveyor and grizzly at Synclinorium shaft, $583,000, Construction and equipping of a suspended floor 11 KV/3.3KV Mufulira Deeps Main Substation, Installation of Switchgear and cabling in the winder substation