Summary
Overview
Work History
Education
Skills
TASK & JOB RESPONSIBILITES
Work Availability
Timeline
Hi, I’m

EMAD SARMINI

CIVIL ENGINEER (INFRASTRUCTURE)
DOHA,Qatar
Every problem is a gift—without problems we would not grow.
Tony Robbins
EMAD  SARMINI

Summary

Overall 15 years' experience as a Project Manager with the comprehensive back ground in Construction of Air Bases, Roads, , and structures, Canals, Tunnels and Utilities Services including 23 years in G.C.C With contractors

Overview

28
years of professional experience
5
years of post-secondary education
3
Languages

Work History

Shamwings Trading & Transportation
DOHA

Project Manager
11.2019 - Current

Job overview

Project Name: Different Projects with many companies Ex:UCC , L&T , AL BALAGH , MCC , GET , MITTITO


Scope of Work: (Planning, Coordination, Project Control, Communications) Excavation for cuttings, Remove existing asphalt layers & lay asphalt binder course 70mm, Improve existing sub base material to comply with the specification, lay and compacted to the required level, Scarify, water and Compact existing layer, laying of sub-grade material (2 layers), Preparation of formation, Adjustment of Manholes, Gullies to the required levels, Install future service ducts, Remove & Re-fix damaged Curbstones, Interlock tiles, demolitions, concrete works, Construct new entrances, Install Storm water network, Water network, Street lighting works, Apply Road Markings & Install Road signs

AL JARF TRADING
ABUDABI

Project Manager
12.2017 - 08.2019

Job overview

Project Name: Maintenance of Roads and car parking in Al Ain – Stage 11. Scope of Work: (Planning, Coordination, Project Control, Communications) Excavation for cuttings, Remove existing asphalt layers & lay asphalt binder course 70mm, Improve existing sub base material to comply with the specification, lay and compacted to the required level, Scarify, water and Compact existing layer, laying of sub-grade material (2 layers), Preparation of formation, Adjustment of Manholes, Gullies to the required levels, Install future service ducts, Remove & Re-fix damaged Curbstones, Interlock tiles, demolitions, concrete works, Construct new entrances, Install Storm water network, Water network, Street lighting works, Apply Road Markings & Install Road signs.

AL SAHRA GROUP LLC
FUJIRA

CONSTRUCTION MANAGER
11.2016 - 12.2017

Job overview

Project Name: Maintenance of Roads and Bridges in Al Ain – Stage 6. Scope of Work: (Planning, Coordination, Project Control, Communications) Excavation for cuttings, Remove existing asphalt layers & lay asphalt binder course 70mm, Improve existing sub base material to comply with the specification, lay and compacted to the required level, Scarify, water and Compact existing layer, laying of sub-grade material (2 layers), Preparation of formation, Adjustment of Manholes, Gullies to the required levels, Install future service ducts, Remove & Re-fix damaged Curbstones, Interlock tiles, demolitions, concrete works, Construct new entrances, Install Storm water network, Water network, Street lighting works, Apply Road Markings & Install Road signs.

AL ULA TRANSPORTING
Al Ain

PROJECT MANAGER
05.2015 - 10.2016

Job overview

Project Name: Maintenance of Roads and Bridges in Al Ain – Stage 6. Scope of Work: (Planning, Coordination, Project Control, Communications) Excavation for cuttings, Remove existing asphalt layers & lay asphalt binder course 70mm, Improve existing sub base material to comply with the specification, lay and compacted to the required level, Scarify, water and Compact existing layer, laying of sub-grade material (2 layers), Preparation of formation, Adjustment of Manholes, Gullies to the required levels, Install future service ducts, Remove & Re-fix damaged Kerbstones, Interlock tiles, demolitions, concrete works, Construct new entrances, Install Storm water network, Water network, Street lighting works, Apply Road Markings & Install Road signs.

AL FAHJAN TRADING
AL AIN

PROJECT MANAGER
05.2014 - 04.2015

Job overview

Project Name: sheibat al watah, development project infrastructure. Zone B Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing curbstones, Fixing ducts, Remove asphalt, Remove curbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed

Desert Man Trading & Contracting Co
AL AIN

PROJECT ENGINEER
01.2014 - 06.2014

Job overview

Project Name: Construction and Maintenance of Roads and other Services at the Abu Dhabi New Airport. Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables.

Canar Trading & Contracting Co
Kuwait

PROJECT ENGINEER
01.2012 - 12.2013

Job overview

Project Name: Construction, Completion and Maintenance of Roads, Overpasses, Storm Water Drainage, Sewer and other Services (Jamal Abdul Nasser Street RA/167). Scope of Work: 3 Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Carrying of storm water and sewerage line.

El-Faid Trading And Contracting Co
Kuwait

PROJECT ENGINEER
01.2011 - 12.2012

Job overview

Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed, Carrying of storm water and sewerage line.

Combined Group Contracting Co
Kuwait

PROJECT MANAGER
01.2005 - 12.2010

Job overview

Project Name: Abu-Fatira Infrastructure Contract RA/146 Project Name: Construction 1200mm Fresh Water Contract 3638/MEW Project Name: Infrastructure Work for 1220 Houses at Jaber Al Ahmad City Contract/1000 for Public Authority for Housing Welfare Project Name: Jahra Infrastructure Tiles Contract No/103 for Ministry of Public Works Project Name: Jahra Infrastructure Roads and Sanitary Maintenance Contract No/90 for Ministry of Public Works Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed, Carrying of storm water and sewerage line.

Mubarak Al Hajraf Contracting Co
Kuwait

SITE CIVIL ENGINEER
01.2003 - 12.2004

Job overview

Project Name: Alahmadi Infrastructure Roads & Sanitary Maintenance Contract No/92 for Ministry of Public Works Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock 4 , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed.

Copri Construction Enterprises W.L.L Co
Kuwait

SITE CIVIL ENGINEER
01.2002 - 01.2003

Job overview

Project Name: Infrastructure Work for Houses at South Jahra Contract No/908 for Public Authority for Housing Welfare Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed.

Shaheen Alganim Contracting Co
Kuwait

SITE CIVIL ENGINEER
01.2001 - 12.2002

Job overview

Project Name: Jahra Infrastructure Roads & Sanitary Maintenance Contract No/68 for Ministry of Public Works Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed.

Bodai Contracting Co
Kuwait

SITE CIVIL ENGINEER
01.1997 - 01.2000

Job overview

Project Name: Infrastructure Work for 296 Houses at West Jeleeb Al Shuwaikh Contract for Public Authority of Housing Welfare Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed.

Arsan Contracting Co
Kuwait

SITE CIVIL ENGINEER
06.1995 - 12.1996

Job overview

Project Name: Infrastructure Work for 296 Houses at West Jeleeb Al Shuwaikh Contract for Public Authority of Housing Welfare Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed.

Education

USSR CIVIL ENGINEERING UNIVERSITY AZARBAIJAN
AZARBAIJAN |BAKU

Master of Science from Civil Engineering
09.1990 - 05.1995

Skills

Competent in Microsoft office

undefined

TASK & JOB RESPONSIBILITES

  

*Managing projects and within the given timeline, with quality as per budget.

*Ensure projects risks are reported to higher management together with solutions and alternatives. 

*Responsible for managing a project through the project life cycle. (planning to close out)

*Overall leadership of the project team ensuring safely, timeliness, and to-cost delivery of the projects.

*Directs the project planning, design; construction and approval processes.

*Runs the project schedule and negotiates interdependencies.

*Co-ordinates with all parties involved with the project; internal departments, consultants and contractors.

*Monitors progress against targets and solves complex issues between stakeholders.

*Manages project budgets and reports progress against budget.

*Creates and reviews (Request for Proposal) RFP, then assesses the proposals

*Customizing the Project briefs, technical scope of work and preliminary Concept plan requirements for all developments.

*Ensuring that the service delivery required from other Departments (i.e. Planning & Development, Procurement) is on time and as per project needs.

*Keeps management updated on the technical aspects of development and drives the service providers to deliver as per agreements.

*Coordination with all departments on all technical requirements and delivery

*Oversee the delivery of projects according to agreed time frames

*Resolves and coordinate with relevant service providers such as Operations, on technical, engineering and maintenance  requirements.

*Coordinate with the procurement department and work within their framework.

*Act on behave of the Commercial Department to provide the in-house development and technical expertise to full needs of the Commercial Division and the Commercial Subsidiaries 

Availability
See my work availability
Not Available
Available
monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Project Manager

Shamwings Trading & Transportation
11.2019 - Current

Project Manager

AL JARF TRADING
12.2017 - 08.2019

CONSTRUCTION MANAGER

AL SAHRA GROUP LLC
11.2016 - 12.2017

PROJECT MANAGER

AL ULA TRANSPORTING
05.2015 - 10.2016

PROJECT MANAGER

AL FAHJAN TRADING
05.2014 - 04.2015

PROJECT ENGINEER

Desert Man Trading & Contracting Co
01.2014 - 06.2014

PROJECT ENGINEER

Canar Trading & Contracting Co
01.2012 - 12.2013

PROJECT ENGINEER

El-Faid Trading And Contracting Co
01.2011 - 12.2012

PROJECT MANAGER

Combined Group Contracting Co
01.2005 - 12.2010

SITE CIVIL ENGINEER

Mubarak Al Hajraf Contracting Co
01.2003 - 12.2004

SITE CIVIL ENGINEER

Copri Construction Enterprises W.L.L Co
01.2002 - 01.2003

SITE CIVIL ENGINEER

Shaheen Alganim Contracting Co
01.2001 - 12.2002

SITE CIVIL ENGINEER

Bodai Contracting Co
01.1997 - 01.2000

SITE CIVIL ENGINEER

Arsan Contracting Co
06.1995 - 12.1996

USSR CIVIL ENGINEERING UNIVERSITY AZARBAIJAN

Master of Science from Civil Engineering
09.1990 - 05.1995
EMAD SARMINICIVIL ENGINEER (INFRASTRUCTURE)