Overall 15 years' experience as a Project Manager with the comprehensive back ground in Construction of Air Bases, Roads, , and structures, Canals, Tunnels and Utilities Services including 23 years in G.C.C With contractors
Project Name: Different Projects with many companies Ex:UCC , L&T , AL BALAGH , MCC , GET , MITTITO
Scope of Work: (Planning, Coordination, Project Control, Communications) Excavation for cuttings, Remove existing asphalt layers & lay asphalt binder course 70mm, Improve existing sub base material to comply with the specification, lay and compacted to the required level, Scarify, water and Compact existing layer, laying of sub-grade material (2 layers), Preparation of formation, Adjustment of Manholes, Gullies to the required levels, Install future service ducts, Remove & Re-fix damaged Curbstones, Interlock tiles, demolitions, concrete works, Construct new entrances, Install Storm water network, Water network, Street lighting works, Apply Road Markings & Install Road signs
Project Name: Maintenance of Roads and car parking in Al Ain – Stage 11. Scope of Work: (Planning, Coordination, Project Control, Communications) Excavation for cuttings, Remove existing asphalt layers & lay asphalt binder course 70mm, Improve existing sub base material to comply with the specification, lay and compacted to the required level, Scarify, water and Compact existing layer, laying of sub-grade material (2 layers), Preparation of formation, Adjustment of Manholes, Gullies to the required levels, Install future service ducts, Remove & Re-fix damaged Curbstones, Interlock tiles, demolitions, concrete works, Construct new entrances, Install Storm water network, Water network, Street lighting works, Apply Road Markings & Install Road signs.
Project Name: Maintenance of Roads and Bridges in Al Ain – Stage 6. Scope of Work: (Planning, Coordination, Project Control, Communications) Excavation for cuttings, Remove existing asphalt layers & lay asphalt binder course 70mm, Improve existing sub base material to comply with the specification, lay and compacted to the required level, Scarify, water and Compact existing layer, laying of sub-grade material (2 layers), Preparation of formation, Adjustment of Manholes, Gullies to the required levels, Install future service ducts, Remove & Re-fix damaged Curbstones, Interlock tiles, demolitions, concrete works, Construct new entrances, Install Storm water network, Water network, Street lighting works, Apply Road Markings & Install Road signs.
Project Name: Maintenance of Roads and Bridges in Al Ain – Stage 6. Scope of Work: (Planning, Coordination, Project Control, Communications) Excavation for cuttings, Remove existing asphalt layers & lay asphalt binder course 70mm, Improve existing sub base material to comply with the specification, lay and compacted to the required level, Scarify, water and Compact existing layer, laying of sub-grade material (2 layers), Preparation of formation, Adjustment of Manholes, Gullies to the required levels, Install future service ducts, Remove & Re-fix damaged Kerbstones, Interlock tiles, demolitions, concrete works, Construct new entrances, Install Storm water network, Water network, Street lighting works, Apply Road Markings & Install Road signs.
Project Name: sheibat al watah, development project infrastructure. Zone B Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing curbstones, Fixing ducts, Remove asphalt, Remove curbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed
Project Name: Construction and Maintenance of Roads and other Services at the Abu Dhabi New Airport. Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables.
Project Name: Construction, Completion and Maintenance of Roads, Overpasses, Storm Water Drainage, Sewer and other Services (Jamal Abdul Nasser Street RA/167). Scope of Work: 3 Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Carrying of storm water and sewerage line.
Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed, Carrying of storm water and sewerage line.
Project Name: Abu-Fatira Infrastructure Contract RA/146 Project Name: Construction 1200mm Fresh Water Contract 3638/MEW Project Name: Infrastructure Work for 1220 Houses at Jaber Al Ahmad City Contract/1000 for Public Authority for Housing Welfare Project Name: Jahra Infrastructure Tiles Contract No/103 for Ministry of Public Works Project Name: Jahra Infrastructure Roads and Sanitary Maintenance Contract No/90 for Ministry of Public Works Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed, Carrying of storm water and sewerage line.
Project Name: Alahmadi Infrastructure Roads & Sanitary Maintenance Contract No/92 for Ministry of Public Works Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock 4 , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed.
Project Name: Infrastructure Work for Houses at South Jahra Contract No/908 for Public Authority for Housing Welfare Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed.
Project Name: Jahra Infrastructure Roads & Sanitary Maintenance Contract No/68 for Ministry of Public Works Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed.
Project Name: Infrastructure Work for 296 Houses at West Jeleeb Al Shuwaikh Contract for Public Authority of Housing Welfare Scope of Work: Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed.
Project Name: Infrastructure Work for 296 Houses at West Jeleeb Al Shuwaikh Contract for Public Authority of Housing Welfare Excavation for cuttings, Sub-grade, Granular sub-base and Road base for rectangular and octagonal paving block, Lower existing cables, Fixing Interlock , Fixing kerbstones, Fixing ducts, Remove asphalt, Remove kerbstones, Remove Interlock, Excavated for street light and backfilling, Manholes-adjust the cover level of existing to suit the new pavement level including necessary excavation and backfill, demolitions, concrete works, block works, protective paint and reinstatement of works disturbed.
Competent in Microsoft office
undefined
*Managing projects and within the given timeline, with quality as per budget.
*Ensure projects risks are reported to higher management together with solutions and alternatives.
*Responsible for managing a project through the project life cycle. (planning to close out)
*Overall leadership of the project team ensuring safely, timeliness, and to-cost delivery of the projects.
*Directs the project planning, design; construction and approval processes.
*Runs the project schedule and negotiates interdependencies.
*Co-ordinates with all parties involved with the project; internal departments, consultants and contractors.
*Monitors progress against targets and solves complex issues between stakeholders.
*Manages project budgets and reports progress against budget.
*Creates and reviews (Request for Proposal) RFP, then assesses the proposals
*Customizing the Project briefs, technical scope of work and preliminary Concept plan requirements for all developments.
*Ensuring that the service delivery required from other Departments (i.e. Planning & Development, Procurement) is on time and as per project needs.
*Keeps management updated on the technical aspects of development and drives the service providers to deliver as per agreements.
*Coordination with all departments on all technical requirements and delivery
*Oversee the delivery of projects according to agreed time frames
*Resolves and coordinate with relevant service providers such as Operations, on technical, engineering and maintenance requirements.
*Coordinate with the procurement department and work within their framework.
*Act on behave of the Commercial Department to provide the in-house development and technical expertise to full needs of the Commercial Division and the Commercial Subsidiaries