Innovative, experienced rigger with 22+ years of experience in setting up and operating rigging equipment for heavy lifting operations, skilled in working with both manual and automated rigging systems. Other skills include reading and interpreting blueprints and drawings to determine proper slinging techniques. Restored 70 meters of conveyor belt structure that collapsed onto stockpile ahead of schedule and within budget in January, 2019.
Maintained safety standards and regulations while operating rigging equipment.
Selected appropriate rigging gear for each load by preparing beans, pulleys, bolts and clamps.
Levelled, aligned and did set heavy machinery and equipment for rigging activities.
Planned, Scheduled, Coordinated and supervised rigging operations.
Collaborated with team members and successfully completed repairing P2 Primary Crusher, apron feeders, magnet, lip and concave liners ahead of schedule and within budget
Did maintenance activities on cyclone feed pumps, mill liner replacements, cyclones, flotation cells, agitator shafts etc.
Determined appropriate load-bearing capacity of various types of rigging systems and components.
Ensured that all safety protocols are followed while setting up and operating rigging systems.
Mentored and coached new crew members on proper techniques for setting up and operating rigging systems safely.
Safely disassembled rigging equipment when no longer needed for a production or performance.
Followed manufacturer's instructions for maintenance and storage of rigging equipment.
Researched new technologies related to rigging systems in order to stay current with best practices in the industry.
Maintained detailed records regarding inspections of all rigging components used on a project.
Developed plans for efficient setup, takedown operations based upon size, scope of projects.
Conducted risk assessments before each performance or production in order to identify potential hazards associated with the use of lifting devices.
Maintained open communication with crane and other equipment operators to smoothly transport loads.
Planned and prepared rigging before performances and handled rigging changes during performances.
Signaled and verbally directed workers engaged in hoisting and moving loads to protect workers and materials.
Unloaded materials and arranged in specific locations.
Reviewed job specifications and site conditions to determine appropriate rigging configurations.
Rigger Foreman
GMB SARL, KAMOTO COPPER COMPANY, GLENCORE
Kolwezi, Democratic Republic of Congo
06.2021 - 02.2023
Provided guidance and supervision to a team of riggers in the safe, efficient and effective completion of rigging tasks.
Monitored all rigging activities for safety compliance and ensured that any issues were promptly addressed.
Developed and implemented rigging plans for various projects, ensuring accuracy and efficiency.
Evaluated crane capacity calculations to ensure proper equipment utilization.
Inspected and maintained rigging equipment on an ongoing basis to ensure it was in good working order.
Trained new personnel in proper rigging techniques, safety procedures and use of specialized equipment.
Conducted regular safety meetings with crew members to review current policies and procedures.
Resolved job-site conflicts in a timely manner by communicating effectively with stakeholders involved.
Reviewed customer specifications to determine the most cost-effective approach for completing each project within budget constraints.
Identified potential hazards associated with each job site prior to beginning work operations.
Troubleshot problems related to lifting operations or equipment malfunctions when they occurred during jobsite activities.
Scheduled repairs or maintenance activities for cranes or other heavy machinery used in rigging operations.
Analyzed data collected from completed jobsites to identify areas where operational efficiencies could be improved upon.
Assisted with developing detailed estimates of time required for completion of particular tasks or entire projects.
Performed complex mathematical calculations such as load weight estimation based on given factors such as crane lift radius and height, wind speed.
Prepared and planned worksites to help jobs run smoothly.
Delegated duties to employees based on skill set.
Delegated work to staff, setting priorities and goals.
Trained and monitored employees to teach daily tasks and improve performance.
Reported project progress, site problems and labor status to supervisors.
Kept production team moving forward for progress in daily site operations.
Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
Established and enforced procedures and work standards, promoting team performance and safety.
Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
Allocated material and labor resources to promote on-time and under-budget project completion.
Defined and monitored personnel and project schedules to ensure on-time project completion.
Recruited and hired workers, in addition to supervising and monitoring daily performance.
Artisan Rigger
SOMIKA COPPER PROJECT
Lubumbashi , Democratic Republic of Congo
04.2019 - 05.2021
Securely attached loads to rigging equipment using clamps, shackles, and other fasteners.
Inspected rigging equipment for any visible damage or defects prior to use.
Determined appropriate load-bearing capacity of various types of rigging systems and components.
Position stage scenery, lighting fixtures, props, and other objects with precision accuracy using hoists, pulleys, winches, lifts, and cranes.
Troubleshoot problems with rigging systems during performances or productions.
Ensured that all safety protocols were followed while setting up and operating rigging systems.
Safely disassembled rigging equipment when no longer needed for a production or performance.
Followed manufacturer's instructions for maintenance and storage of rigging equipment.
Researched new technologies related to rigging systems in order to stay current with best practices in the industry.
Maintained detailed records regarding inspections of all rigging components used on a project.
Developed plans for efficient setup, takedown operations based upon size, scope of projects.
Conducted risk assessments before each performance or production in order to identify potential hazards associated with the use of lifting devices.
Maintained open communication with crane and other equipment operators to smoothly transport loads.
Coordinated structural and heavy lifts weighing up to [Number] pounds with properly rigged equipment.
Safely and efficiently rigged steel members for connectors and pre-assembled bent sections.
Planned and prepared rigging before performances and handled rigging changes during performances.
Conducted frequent safety evaluations on rigging equipment.
Signaled and verbally directed workers engaged in hoisting and moving loads to protect workers and materials.
Unloaded materials and arranged in specific locations.
Reviewed job specifications and site conditions to determine appropriate rigging configurations.
Transported materials, tools and machines to installation sites.
Controlled load movement around obstacles and at varying heights to deliver up to [Number] pounds without incident.
Reviewed and interpreted load charts and calculated weight.
Sorted and erected steel, bolt-up and torque connections.
Set up rigging equipment for use in production sets and stages.
Rigger/Rigger Supervisor
BARRICK LUMWANA MINING COMPANY
Solwezi, Zambia
04.2009 - 03.2019
Set up rigging equipment for use in production sets and stages.
Securely attached loads to rigging equipment using clamps, shackles, and other fasteners.
Inspected rigging equipment for any visible damage or defects prior to use.
Determined appropriate load-bearing capacity of various types of rigging systems and components.
Position stage scenery, lighting fixtures, props, and other objects with precision accuracy using hoists, pulleys, winches, lifts, and cranes.
Troubleshoot problems with rigging systems during performances or productions.
Ensured that all safety protocols were followed while setting up and operating rigging systems.
Mentored and coached new crew members on proper techniques for setting up and operating rigging systems safely.
Safely disassembled rigging equipment when no longer needed for a production or performance.
Followed manufacturer's instructions for maintenance and storage of rigging equipment.
Researched new technologies related to rigging systems in order to stay current with best practices in the industry.
Maintained detailed records regarding inspections of all rigging components used on a project.
Developed plans for efficient setup, takedown operations based upon size, scope of projects.
Conducted risk assessments before each performance or production in order to identify potential hazards associated with the use of lifting devices.
Maintained open communication with crane and other equipment operators to smoothly transport loads.
Used bolts and clamps to attach pulleys and fix beams, ceilings and gin pole booms.
Safely and efficiently rigged steel members for connectors and pre-assembled bent sections.
Planned and prepared rigging before performances and handled rigging changes during performances.
Conducted frequent safety evaluations on rigging equipment.
Signaled and verbally directed workers engaged in hoisting and moving loads to protect workers and materials.
Reviewed job specifications and site conditions to determine appropriate rigging configurations.
Reviewed and interpreted load charts and calculated weight.
Supervised and coordinated the rigging of cargo for loading and unloading operations.
Monitored team performance to ensure all safety protocols were followed.
Developed and implemented procedures for proper handling of heavy equipment.
Inspected rigging equipment, such as slings, shackles, hoists and spreader bars for wear or damage.
Ensured all personnel were trained in proper rigging techniques.
Maintained accurate records of load weights, lift plans and other data related to rigging operations.
Scheduled maintenance inspections on all rigging equipment.
Trained new employees in safe use of tools, lifting techniques and job-specific duties.
Prepared detailed reports regarding any incidents that occurred during rigging operations.
Assessed potential hazards associated with each job site prior to commencement of work activities.
Investigated accidents or near misses involving crane operation or material handling activities.
Monitored personnel during lifts to ensure they are working within established safety guidelines.
Created a safe work environment by enforcing company policies and regulations pertaining to rigging operations.
Provided guidance on how best to utilize available equipment resources.
Resolved customer inquiries promptly and efficiently in accordance with company standards.
Collaborated closely with other departments on projects requiring special attention or expertise.
Responded quickly to emergency situations as needed.
Performed daily pre-shift checklists on cranes, hoists, forklifts.
Rigger/Structural Steel Erector
TUBULAR TECHNICAL CONSTRUCTION , LUMWANA COPPER PROJECT
Solwezi , Zambia
07.2007 - 03.2009
Set up rigging equipment for use in production sets and stages.
Securely attached loads to rigging equipment using clamps, shackles, and other fasteners.
Inspected rigging equipment for any visible damage or defects prior to use.
Ensured that all safety protocols are followed while setting up and operating rigging systems.
Developed plans for efficient setup, takedown operations based upon size, scope of projects.
Conducted risk assessments before each performance or production in order to identify potential hazards associated with the use of lifting devices.
Safely and efficiently rigged steel members for connectors and pre-assembled bent sections.
Planned and prepared rigging before performances and handled rigging changes during performances.
Conducted frequent safety evaluations on rigging equipment.
Signaled and verbally directed workers engaged in hoisting and moving loads to protect workers and materials.
Unloaded materials and arranged in specific locations.
Transported materials, tools and machines to installation sites.
Sorted and erected steel, bolt-up and torque connections.
Read and interpreted blueprints, drawings, sketches and other structural documents to determine the type of material required for each project.
Installed steel columns, beams, braces and girders according to specifications using cranes, hoists, rigging gear and hand tools.
Aligned structures with plumb bobs, levels and lasers to ensure accuracy.
Attached steel components together with bolts or welding equipment as needed.
Erected scaffolding around the structure to provide a safe working platform.
Secured temporary anchors into concrete when necessary.
Identified potential safety hazards in the work area and took corrective action when needed.
Inspected all connections for tightness prior to completion of erection process.
Ensured that all materials used were compliant with applicable building codes and standards.
Assisted crane operators with lifting heavy steel members during installation process.
Performed routine maintenance tasks such as greasing moving parts on cranes or other machines used in erecting structures.
Used chainsaws and cutting torches to cut steel members into proper lengths for installation.
Operated forklifts and man-lifts safely while transporting materials from one location to another.
Maintained daily logs of progress on projects which included time worked as well as any delays due to weather or other issues encountered onsite.
Repaired damaged steel components by grinding off welds or replacing defective pieces.
Followed safety protocols at all times including wearing protective clothing such as hard hats, gloves and goggles.
Removed debris from job sites upon completion of projects ensuring that no hazardous materials remained behind.
Assisted in dismantling existing structures when necessary before beginning new construction projects.
Provided guidance and instruction to less experienced workers regarding proper techniques for erecting structural steel components.
Loaded completed projects onto flatbed trucks for delivery to customers' locations if needed.
Communicated effectively with supervisors about work progress throughout each project's duration.
Coordinated closely with other tradespeople involved in the same construction project such as electricians or plumbers.
Fabricated steel frames, columns, beams and girders according to blueprints or instructions from supervisors.
Set up hoisting equipment to lift and place structural steel items.
Performed mod assembly, erected and connected structural steel and leveled and torqued connections after steel placement.
Positioned steel units, aligned holes and inserted temporary bolts while checking alignments and joining steel parts.
Removed and replaced existing grating and structural steel with [Type] materials.
Studied blueprints, drawings and specifications to determine layout of work.
Supervised crew members in proper steel placement in [Type] locations.
Aligned and connected structural components to create safe, long-lasting results.