Summary
Overview
Work history
Education
Skills
Websites
Languages
Custom Section
Personal Information
Project
Timeline
Generic
Kingshuk Nandi

Kingshuk Nandi

Midnapore,India

Summary

Accomplished professional with expertise in scope and schedule management, client relationship management, billing and resource management, and project monitoring and quality control. Demonstrates a strong ability to enhance operational efficiency through meticulous planning and execution. Committed to fostering robust client relationships while ensuring projects are delivered on time and within budget. Aspires to leverage skills in a dynamic environment to drive organizational success.

Overview

18
18
years of professional experience
7
7
years of post-secondary education

Work history

Design & Build of 54 MLD WWTP, NGWERERE

VA TECH WABAG LIMITED
Lusaka, Zambia
05.2025 - Current

Assisted in overseeing construction activities for Ngwerere WWTP under Lusaka Water.

Supported project teams to ensure tasks were completed efficiently.

  • Contributed to maintaining safety and quality standards on site.

Assistant Manager (Acting as Deputy Project Manager)

Zetwerk Manufacturing Business Pvt Ltd
Sahibganj, Jharkhand, India
07.2024 - 05.2025
  • Assisted junior staff with assigned tasks to meet project schedules.
  • Prepared reports on project budgeting and forecasting.
  • Mediated stakeholder disputes using problem-solving methods.
  • Conducted cost evaluations of proposed project modifications.
  • Supported daily management of project team operations.

Resident Engineer (Site Civil)

VA TECH WABAG LIMITED
Kanpur, UP, India
01.2020 - 07.2024
  • Assisted in civil works execution for common effluent treatment plant and common chrome recovery unit.
  • Supported preparation of micro schedules and bills of quantities for structures.
  • Facilitated client and contractor billing processes while managing manpower and materials.
  • Ensured site quality compliance with approved plans and safety standards.
  • Helped in resource planning and arrangement for project requirements.
  • Documented responses for client RFIs and prepared methodologies for construction activities.
  • Participated in pre-commissioning activities, including water run and hydraulic tests.
  • Contributed to achieving 3 million safe man hours during water run test.
  • Aided in timely handover of common chrome recovery unit with zero accidents and maintained quality standards.

Senior Engineer

BGR ENERGY SYSTEMS LIMITED
Ghatampur, India
01.2018 - 09.2020
  • 3X660 MW TPP PROJECT/BOP/WTP, CW, ETP, RW
  • Client: NUPPL
  • Completion of Cooling Water Pump House (CWPH), CW Forebay, CW Channel (Excavation: 1,20,000 Cum, PCC: 22500m3, RCC:15400m3) within the schedule time (one year, with PRW Contractor) with maintaining proper quality of work & also maintaining safety.
  • After completion of the CW System, engaged in Rapid Gravity Filter, Central Monitoring Basin and Foundation of Pipe Rack Foundation work. (PCC: 1500m3, RCC: 8300m3) .
  • Apart from Site Execution, below mentioned had been done- Contractor, PRW & Client Billing. BOQ of the structure (Item wise), Preparation of work order. Reconciliation of concrete, cement, steel & other consumable items. Preparation projection sheet (manpower cost Vs Measurement cost of the PRW Contractor).

Senior Executive- Civil

Bhilai Engineering Corporation Limited
Jagdalpur (CG) & Rourkela (Odisha)
01.2013 - 12.2017
  • Assisted in the construction of Coke Dry Cooling Plant 1 and 2 and related structures in the coke oven complex.
  • Supported the preparation of the Bill of Quantities (BOQ) and work orders for contractors.
  • Aided in determining client and contractor material and manpower needs according to the scheduled plan.
  • Reconciled cement, steel, and other consumables as required.
  • Participated in dismantling and reconstructing structures with RCC and HRC for the Rourkela Steel Plant.
  • Contributed to the repair and renovation of several structures based on contract and approved drawings.
  • Engaged in all building finishing work related to the project.
  • Ensured completion within contractual time frames while maintaining site safety and quality standards.

Assistant Engineer

IVRCL Infrastructure and Projects Limited
Paradeep, Odisha
04.2010 - 01.2013
  • IOCL refinery/finished product area/bullet area for LPG, Pradip
  • Client: Indian Oil Corporation Limited
  • As a Site Engineer in Construction of LPG Storage Bullet (Foundation, Retaining wall, tunnels) and construction of an Electrical Substation Building (RCC, Brick work and Plastering) Site execution Preparation of Bar Bending Schedule Contractor & Client Handling. Contractor Billing Site Quality & Safety.

Assistant Engineer (Site Civil) & Diploma Engineer Trainee

Shapoorji Pallonji & Co Ltd
Vizag & Hyderabad
07.2008 - 04.2010
  • Joined at Vizag Steel Plant as a Diploma Engineer trainee, posted as a site engineer under experienced Sr Engineer. Looking after the construction of turbo blower building foundation work and turbo blower foundation. Bar bending schedule and site supervision as per drawing.
  • After completion of my training period got position as assistant Engineer and posted in tishman spyer ICICI venture building project. Micro concreting Contractor billing Site handling and supervision as per drawing and direction.

Education

B TECH - Civil engineering

Kalinga University
Raipur
09.2019 - 06.2022

Diploma - Civil Enginering

West Bengal Council of Technical Education
09.2005 - 06.2008

Higher Secondary - undefined

West Bengal State Council Of Heigher Secondary Education
09.2003 - 06.2005

Secondary Education - undefined

West Bengal Board of Secondary Education

Skills

  • Scope and schedule management
  • Client relationship management
  • Billing and resource management
  • Project monitoring and quality control

Languages

Bengali
English
Hindi
Odia

Custom Section

I consent to the processing of my personal data for the purpose of recruitment for the position to which I am applying.

Personal Information

  • Date of birth: February 1, 1987
  • Gender: Male
  • Nationality: Indian
  • Marital status: Married

Project

  • Sahibganj RWS Project, Sahibganj, Jharkhand, 393 Cr., To treat the intake water from Ganges in two WTPs and supply to villages through 1100 kms pipeline for providing drinking water facility to every villager.
  • 20 MLD CETP Project, Jajmau, Kanpur, 450 Cr., To collect and treat the tannery effluent, make The Ganga Clean from Pollution.
  • 3X660 MW Thermal Power Plant Project, Ghatampur, Kanpur, 2700 Cr., Maintain the shortage of Electricity in India.
  • Construction of Coke Oven Battery 2Nos along with CDCP unit 2nos, Jagdalpur, Chhattisgarh, 1450 Cr., Introducing a New Steel Plant in India, for fulfilling the demand of steel.
  • Rebuilding of Coke Oven Battery no.3, Rourkela, Odisha, 475 Cr., Maintain the productivity and quality of Steel in existing steel plant.
  • IOCL Refinery, BOOT Project/Finished product, Paradip, Odisha, 4500 Cr., To build a new refinery.
  • Tishman Spyer ICICI venture, Nanakkaramguda, Hyderabad, 275 Cr., A hub of software in Hyderabad.
  • TPP project, RINL, Vizag, Andhra Pradesh, 180 Cr., To expand the Steel plant for achieving 16 million ton liquid steel production.

Timeline

Design & Build of 54 MLD WWTP, NGWERERE

VA TECH WABAG LIMITED
05.2025 - Current

Assistant Manager (Acting as Deputy Project Manager)

Zetwerk Manufacturing Business Pvt Ltd
07.2024 - 05.2025

Resident Engineer (Site Civil)

VA TECH WABAG LIMITED
01.2020 - 07.2024

B TECH - Civil engineering

Kalinga University
09.2019 - 06.2022

Senior Engineer

BGR ENERGY SYSTEMS LIMITED
01.2018 - 09.2020

Senior Executive- Civil

Bhilai Engineering Corporation Limited
01.2013 - 12.2017

Assistant Engineer

IVRCL Infrastructure and Projects Limited
04.2010 - 01.2013

Assistant Engineer (Site Civil) & Diploma Engineer Trainee

Shapoorji Pallonji & Co Ltd
07.2008 - 04.2010

Diploma - Civil Enginering

West Bengal Council of Technical Education
09.2005 - 06.2008

Higher Secondary - undefined

West Bengal State Council Of Heigher Secondary Education
09.2003 - 06.2005

Secondary Education - undefined

West Bengal Board of Secondary Education
Kingshuk Nandi