Summary
Overview
Work History
Education
Skills
References
Hobbies and Interests
Projects
Languages
Websites
Timeline
Generic
Mwila Mpundu

Mwila Mpundu

Solwezi

Summary

Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

6
6
years of professional experience

Work History

Control and Instrumentation Engineer

First Quantum Minerals - Kansanshi Mining Plc
Solwezi
04.2020 - Current
  • Efficiently and effectively delivering complete and appropriate preventive maintenance, improvement, breakdowns and fault analysis on the entire plant for Field Instrumentation and Control Systems and oversee all task schedules, on all relevant equipment, ensuring that administration in areas of responsibility is up to date and accurate, contributing expertise and support to the Engineering and Processing departments.
  • Prioritized and organized tasks to efficiently accomplish service goals.
  • Maintained open communication with team members and stakeholders, resulting in successful project outcomes.
  • Collaborated with others to discuss new opportunities.
  • Completed day-to-day duties accurately and efficiently.
  • Monitored operational trends within an industrial facility through use of SCADA software applications.
  • Implemented safety protocols related to working with hazardous materials in the laboratory environment.
  • Trained and guided new employees according to company standards and procedures.
  • Reviewed engineering drawings to ensure accuracy of specifications for instruments and their associated connections.
  • Analyzed test results from various sensors and developed recommendations for improving system operations.
  • Identified root causes of instrumentation system failures and recommended corrective actions.
  • Scheduled and oversaw preventive maintenance plans, verifying proper operational parameters.
  • Performed preventive maintenance on instrumentation equipment.
  • Inspected and tested instrumentation systems to ensure proper functioning.
  • Documented all work activities related to the installation, calibration, repair or replacement of instruments.
  • Collaborated with multiple engineering disciplines to support research activities.
  • Managed resources, created project schedules and maintained department budgets.
  • Worked with cross-functional teams to achieve goals.
  • Conducted field inspections to assess existing system conditions prior to installation of upgrades or replacements.
  • Resolved problems associated with communication between devices connected in distributed networks.·
  • Generate work orders to conduct planned corrective maintenance tasks using Pronto as a maintenance management system.
  • Ensuring subordinates are complying with safety standards specified by management.
  • Setup and install SCADA on Engineering workstation, operator’s control station, remote workstations and thin clients in the entire plant to improve plant monitoring and control.
  • Install and maintain S7 300 / S7 400 Siemens Simatic Programmable Logical Controllers.
  • Design, development and commissioning of various fiber optic network rings for process control automation. This also include maintenance of optic fiber links for all Remote Terminal Units (RTUs) in the entire concentrator plant linking to various PLCs dotted in different remote locations around the plant.
  • Splice and maintain all fiber optic communication cables for the concentrator plant comprising of three networks namely; PLC network, SCADA network and plant CCTV camera network.
  • Certification /Analysis of fiber optical cables using an Optical Time Domain Reflectometers (OTDR) as well as proper documenting any irregularities (Prepare link health report showing the condition of the installed fiber cable)
  • Profibus DP Certification / Analysis using Profitrace.
  • Configuration and setup of networking equipment such as media converters (optical to electrical and vice versa), switches and optical link modules.
  • Implement / improve security features on all new and existing network switches for the plant production network.
  • Maintenance and Installation of PROFIBUS Industrial communication cables for the Programmable Logic Controllers (PLC) and Remote Terminal Units (RTU).
  • Maintain and install PROFINET (Industrial Ethernet).
  • Process and Equipment Optimization / Fault Analysis and Diagnosis.
  • Carry out Instruments Inter-lock tests on all production critical and auxiliary equipment for the Milling, Crushing & Conveyor Belts circuits. Ensure that they are up to date and functional for the protection of equipment and personnel.
  • Track spares in warehouse and liaise with the warehouse expediting team so as ensure availability of critical spares .

Graduate Engineer- Control and Instrumentation

First Quantum Minerals - Kansanshi Mining Plc
Solwezi
03.2018 - 03.2020
  • Structured Engineer in Training Program over a period of two (2) years
  • Rotations complemented include Kansanshi mine concentrator plant i.e
  • Crushing, Milling and Flotation Leaching, Solvent Extraction and Electro-Winning under refinery plants.
  • Installation, calibration and maintenance of field instruments.
  • Maintenance and installation of field communication bus system.
  • Troubleshoot PROFIBUS communication system.
  • Troubleshooting of field instrumentation problems, Installation of process cameras and other analogy/network CCTV Cameras.
  • Analyze equipment failure and various equipment breakdown trends, Configuration and Installation of Remote Terminal Units (RTUs).
  • Conduction presentation to management on improvement projects completed, Reviewing of existing and drafting new Standard Operating Principles (SOPs) in order to effectively improve on the safety of team mates by making improvements in the way maintenance tasks are tackled.
  • Utilized mathematical skills and understanding of engineering principles to design new products.
  • Investigated and resolved technical issues in a timely manner.
  • Kept permits, logs and isolation tags up to date.
  • Performed calculations and simulations to verify product performance criteria.
  • Provided technical support to other engineers on the team.
  • Performed testing to determine functionality or optimization.
  • Maintained updated knowledge through continuing education and advanced training.
  • Completed day-to-day duties accurately and efficiently.

Education

Bachelor of Engineering - Electrical and Electronic Engineering (Electronics and Telecommunications) -

The University of Zambia
Lusaka Zambia
09-2016

Grade 12 School Certificate -

Mufulira Secondary School
Mufulira Zambia
11-2009

Skills

  • Computer Networking
  • Optic Fiber Cable Splicing
  • Testing and Maintenance
  • Electronic Troubleshooting and Maintenance
  • Maintenance Planning
  • Technical Reporting
  • Certified PROFIBUS Installer
  • Computer Literature (MS Word, Outlook, Excel)
  • Good Mathematical Skills and Management
  • Proficient at Computer Maintenance Management System (Pronto)
  • Thinking Safety
  • Bold Initiative
  • Reliable
  • Adaptability
  • Responsible
  • Team Player
  • Attention to detail
  • Driving Quality
  • Analytical Thinking
  • Interpersonal Communication
  • Computer Skills

References

  • Mr. Jonas Nzima, Coordinator - Instrumentation & Control Systems, Kansanshi Mining Plc, Solwezi, Zambia, +260 966993385
  • Andrew Sikwese, Technical Specialist - Instrumentation, Kansanshi Mining Plc, Solwezi, Zambia, +260 961857863
  • Eng. Kanyanta Mutale, Technical Specialist- Data & Analytics, Reliability, Kansanshi Mining Plc, Solwezi, Zambia, +260968467371

Hobbies and Interests

  • Travelling
  • Good Music
  • Watching Football
  • Industrial Communication / Networking
  • Power Generation / Protection Mechanisms and Control
  • Mining
  • Construction

Projects

  • ADASH Online Vibration Monitoring System, Project Engineer under Instrumentation for the implementation of an Online Vibration Monitoring System for Reliability and Condition Monitoring Section so as to improve on asset management, real time condition monitoring of key production equipment., Installed, wired Adash units and vibration sensors on gyratory crushers, cone crushers, conveyor belts, gearboxes, motors and pumps for the core purpose of monitoring vibrations on critical mechanical bearings conditions for all crushing, conveying and flotation transfer pump circuits at Kansanshi concentrator., Planned, designed and implemented a LAN Network for the online vibration monitoring system comprising of Ethernet/Optic fibers which was interfaced to the main servers for reliability and condition monitoring team., Improved preventive maintenance approach by ensuring that weekly time spent on manual condition monitoring data collection done by technicians in the field was reduced through online monitoring.
  • Metso HP300 Cone Crusher, Part of the commissioning team representing instrumentation for a metso hp 300 cone crusher installation and commissioning., Interpret manufactures electrical schematic drawings and interface the instrumentation or controls from the vendor to plant programmable logic controller., Add additional instruments (pressure transmitters, temperature sensors, speed and level sensors) to the crushers and improve on critical parameters measurement and monitoring through SCADA.
  • Kansanshi Mine Plant Disaster Recovery Network.The main objectives of this project were to: Study the existing fiber optic cables layout of the entire concentrator plant of Kansanshi Mine control system network inter-connecting over 30 LV substations hosting Siemens S7 400 programmable logic controllers., Plan and Design new fiber optic rings covering the entire plant then inter-connect them with the existing network to act as a disaster recovery network., Improve control system network reliability, bandwidth and scalability.Laid / terminated and tested new 2 × 1000m 96-core ADSS single mode fiber used as backbone fiber connecting new remote server room to main plant control system network this made it easy troubleshooting fiber links and improved traffic flow.Laid / terminated and tested new 2× 2000m 24-core single mode fiber cables interconnecting critical substations resulting in an improvement on network redundancy and scalability.Installed new network infrastructure which included communication cabinets, patch panels, media converter chassis, media converters, 1310nm&1550nm single port 1gigabit/s SFPs and Cisco Switches with 4×1gigabit/s uplink ports this improved bandwidth and throughput for all main controllers (PLCs) communication links to the servers from the initial installation of 100MB/s to 1Gig/s.Configured newly installed Cisco switches according to the company private production network.
  • Kansanshi Sulphide (S2) Concentrate Upgrade, Commissioning of the new sulphide concentrate plant with regard to control system networks, Ensured that all communication cables (optic fiber, industrial Ethernet, profibus-Dp and profibus-PA) were laid according to the cable Schedule.Ensured that terminations of Ethernet cables on all motor drives, network switches, media converters, switchgears and programmable logic controllers were done according to company set standards to reduce on equipment communication failures during start-up and operation., Offered support to the optic fiber cables splicing team by ensuring that splice losses achieved were minimal and complied to the set plant company standard of 0.02dB max fusion splice loss.Tested profibus-Dp communication cables linking all remote terminal units and uninterruptible power supplies to the main controller (PLC) using profitrace as a tool. Generated reports advised accordingly and ensured that irregularities were smoothened out prior to start-up.Tested and certified all laid fiber optic cables for the new plant using an OTDR as a testing tool. Interfaced the entire concentrate upgrade plant control system network to the existing plant production network. Also ensured that redundancy in the network was achieved by using two separate fiber optic cables to establish links between main plant server room and the primary controller (PLC) for the new plant.
  • Connected two stand-alone Programmable Logic Controllers (PLC's) for Copper Cathode Stripping Machines at one of Kansanshi Mine electro-winning Plants to the main I/O Server situated at the Engineering sever room which is 4km away. This allowed continuous remote monitoring of process/engineering parameters at the electro-winning plant. Fault finding was also improved, this reduced down time i.e. increased copper stripping.
  • Implemented IFM online vibration monitoring system on all milling circuits (6) mills at Kansanshi mine. Vibration measurements were done on each mill motor drive-end and non-drive end bearings, mill gearbox bearings and pinion shafts bearings. This improved condition monitoring for key machine components and enhanced reliability.
  • Implemented / designed a small control room for the Emergency Response Team (ERT). This had SCADA and CCTV 24/7 monitoring. This project helped the mine fire department to monitor the plant water fire lines critical conditions such as fire lines water pressure, valves positions, flow rates etc. so as to act proactively during maintenance or in the case of a fire emergency. CCTV gave the safety department a clear view of happening in the plant. Any misconduct with regard to safety of personnel/equipment operating could be captured.
  • Installed SMS Relays on small mobile crushers at one of the mine main pit. This allowed remote monitoring of the start/ stop of these small crushers. Run time was monitored remotely.
  • Implemented varies wireless access points which were integrated to the main process control system network for SCADA access.
  • I designed and implemented an optic fiber communication ring linking two primary crushers (Gyratory and Jaw Crusher) to the main process control system network so as to improve on redundancy and communication system reliability.
  • Migration of all Optical size analyzer cameras eight (8) in total installed on key conveyor belts and crushed ore feeders to a Virtual Machine.
  • Installed and implemented a Remote Terminal Unit (RTU) meant for in-pit crushers. Conveyor belts speed, stockpile level, motors winding temperature, vibrations and other parameters were measured and communication was done through an installed fiber optic cable.
  • Project Engineer for the installation, commissioning and maintenance of a PROFIBUS DP-Network for Acid Plant No.4 Substation upgrade project. Work involved linking new Danfoss VFDs, Siemens Soft Starters (SIMOCODEs) and Simeas P Siemens Relay for a Motor Control Center (MCC) powered by a 2MVA power transformer to a PLC.
  • Upgraded all control room operator workstations (×12) in the concentrator plant to windows 10 OS and installed Citect SCADA 2018 R2 to improve on operational efficiency

Languages

  • English (First Language)
  • Bemba (Fluent)
  • Nyanja (Intermediate)

Timeline

Control and Instrumentation Engineer

First Quantum Minerals - Kansanshi Mining Plc
04.2020 - Current

Graduate Engineer- Control and Instrumentation

First Quantum Minerals - Kansanshi Mining Plc
03.2018 - 03.2020

Bachelor of Engineering - Electrical and Electronic Engineering (Electronics and Telecommunications) -

The University of Zambia

Grade 12 School Certificate -

Mufulira Secondary School
Mwila Mpundu